Back to results
Hydro-Booster

Ford · F-53 Motorhome Chassis / F-59 Commercial Stripped Chassis +2 models

Brand-new — never remanufactured · 12-month warranty · 60-day DOA

10Vehicle applications
1999–2004Years covered
7Cross-references

OE numbers

F81Z2005CAF81D2005CAF81Z2005AE

Cardone

52-7367

Interchange

BRB378APPBB0255B5098 cross-reference only — order by a number you know
View cart

Every order is checked before you pay

Will this fit my vehicle?

Choose your vehicle, then check fitment. We confirm the match by VIN or OE before any quote — never automatically.

About this part

Hydro-Booster for Ford · F-53 Motorhome Chassis / F-59 Commercial Stripped Chassis +2 models. A hydraulic booster (hydro-boost) uses power-steering pressure instead of vacuum to assist braking — common on diesel and heavy-duty trucks where engine vacuum is limited. Brand-new unit — not a remanufactured core. OE and Cardone numbers are used only as a cross-reference, so you can order by a number you already know.

VACTIRO confirms fitment by VIN or OE before any quote is issued. No payment is requested until availability, price and return terms are confirmed.

At a glance

Product lineHydro-Booster
Years covered1999–2004, 2006–2009, 2011–2020
Vehicle applications10
Photo statusPhoto pending

This part covers 10 vehicle applications, cross-referenced from the OE / Cardone catalogs. A specific vehicle is confirmed by VIN or OE before any quote.

OE numbers

F81Z2005CAF81D2005CAF81Z2005AE

Cardone

52-7367

Interchange

BRB378APPBB0255B5098
Master cylinder stud thread
3/8x16
Mounting bracket
Included

Further dimensional and material data available on request via the Trade RFQ flow.

VACTIRO does not currently publish third-party certifications on this site.Certifications, test reports and material certs will appear here as they are reviewed and approved for publication. Engineering documentation available on request.
Every unit carries a 12-month limited warranty (manufacturing defects, replacement or credit) plus a 60-day DOA replacement window.Final ordering and shipping terms are confirmed on the quote / PI before any paid order is accepted; carrier details will be published alongside legal entity registration.

For distributors, e-commerce resellers, repair-shop chains or container-volume buyers — submit a Trade RFQ for MOQ, packaging and lead-time terms.

Open Trade RFQ